The Northside Achievement Zone (NAZ) tenant buildout was completed in early 2023, after starting construction in the fall of 2022. This buildout included the construction of the basement and first level, totaling 18,810 SF. We installed an elevator and cut out the existing concrete floor system, installed three new bathrooms in the basement, two new kitchen areas, and remodeled one existing kitchen. In total, for office spaces, we added 12 small offices, 9 large offices, and a large boardroom on the first floor. In addition to all of these improvements, we added meditation rooms and three family academy rooms.